Categories
Telemetry

The last days of InflateSail in space

This weekend I had the opportunity to listen to the satellite InflateSail as it spent its last days in space. I was able to receive one of the final passes in the evening 2:rd of september (2017).

I used the follwing hardware:

  • 2 x 13 el Vårgårda Yagi with RHCP polarisation.
  • Alfaspid RAS rotor.
  • Airspy Mini

And a lot of software:

  • SDR Console V3 with integrated satellite tracking and doppler correction.
  • Soundmodem 0.98b with 1k2 BPSK G3RUH.
  • Online Telemetry Forwarder (DK3WN)
  • KISSDump+ (DK3WN)
  • InflateSail telemetry decoder (DK3WN)

This is a picture during the satellit pass (click for full res):

In this is the last decode of telemetry:

Categories
Ham Satellite news

Icom IC-9700 VHF/UHF/1.2GHz ny SDR transceiver

På Tokyo Hamfair 2017 visar Icom just nu en ny prototyp-transceiver kallad IC-9700 som verkar vara en efterträdare till IC-910H. Det är en renodlad VHF/UHF/SHF-radio och verkar inte ha HF. Vi får hoppas att det blir en rig anpassad för satellittrafik med full duplex och någon smart USB-koppling till dator. Den enda info jag hittat finns hos Icom UK.

Categories
Ham Satellite news

RadFsSat/Fox-1B start 10 november 2017

Hej!

Uppskjutningsdatum klart.

RadFsSat/Fox-1B Integration With P-POD Complete & Waiting for Launch

Following successful integration into the P-POD last week, it has now
been announced that the launch date of RadFxSat/Fox-1B is set for
November 10, 2017.

RadFxSat will fly with four other CubeSats in the ELaNa XIV mission on
the United Launch Alliance Delta II rocket launching NASA’s JPSS-1
satellite from Vandenberg Air Force Base, CA.

After successful
deployment of the JPSS-1 primary payload, the ELaNa XIV CubeSats will be
deployed. RadFxSat should have an orbit lifetime of about seven years in
the projected orbit:
+ 811 km x 440 km
+ i = 97.73 degrees
+ LTAN = 13:20:35

 

73/Håkan

Categories
Telemetry

Bugsat-1 telemetry 2017-08-13

With new 2*13 el yagis I can RX all pass without any problem.

Categories
Telemetry

CAS-4A telemetry 2017-08-02

My first RX from CAS-4A. Very strong 4k8 GMSK at 145.836 MHz. Telemetry “Mode 7 Testmode”.

 

Categories
Hamradio from ISS

ISS Packet QRT

Tyvärr har vi inte hört någon trafik från ISS på ett tag. Det verkar som att det kommer att ta en tid innan den kommer tillbaka. Det är som vi vet en stor utmaning att få amatörradio ombord på ISS att fungera.
Med vänlig hälsning Håkan SM7WSJ


Packet Module Status On Board ISS

ARISS has received several reports stating that the packet system on
ISS is down. Here is what we know and our current forward plan.

The packet system in the Columbus module started to act up late last
week, sending only a beacon. The ARISS team requested a power recycle
by the crew, and with that power recycle, the packet system appears to
have stop functioning completely. Note that this unit has been on-
orbit for 17 years. It was launched on the STS-106 Space Shuttle
Atlantis mission in September 2000 and was built, tested and certified
for flight about 20 years ago.

The ARISS team has had some extensive discussions on the way forward.
We would first like to do some additional troubleshooting with the
existing packet module. It will take some time (weeks) to develop
troubleshooting procedures, get the procedures approved by NASA and
then conduct the tests with the crew. This includes an additional
power cycle. The turnaround time is much longer than usual because a
new crew will soon be arriving on ISS. The current crew is focused on
the new crew arrival and there will be about a one- to two-week
transition after the new crew arrives. On the positive side, one
aspect of our troubleshooting?a second power cycle?will occur
automatically because ARISS is shut down during crew docking and
turned on afterwards. However, there will be more to our
troubleshooting than just the power cycle.

We have some additional plans with alternative solutions, but those
are currently being discussed and prioritized within the ARISS team.
All solutions will require international ARISS team coordination,
additional procedures and crew interaction. People who have
carefully followed ISS operations know that crew time continues to
evolve with the more extensive research that is occurring on-board.
Suffice it to say, it will take longer than what it has taken in the
past to work through this issue.

The above information is to make sure that ARISS properly sets
expectations on how long it will take to resolve this. At this point,
expect a few months with no ARISS packet.

As you all can see, deploying the Interoperable Radio system that is
currently under development by ARISS has become even more critically
important. The ARISS team is laser focused on getting that system
developed and deployed. We are conducting a final design review with
NASA on this system next week. But we cannot get to the finish line
without your help. If you can, please consider a donation to the
ARISS radio fund by clicking on the ARISS donate button on the ARISS
web page (www.ariss.org) or the AMSAT web page (www.amsat.org). All
donations, large and small are appreciated.

On behalf of ARISS, we thank you for your sustained interest and
support of our program.

Sincerely,

Frank H. Bauer, KA3HDO
ARISS International Chair