Categories
Ham Satellite news

AMSAT-SM-nätet 1/5 2011

Hej!

Dagens nät blev svårkört med svaga signaler.

Deltagare

SM4EFW
SM4JLX
SM5HL
SM6HBI (snabb incheck)
SM7WSJ

*Varit årsmöte och vi avvaktar information

*Nyhetsbrev Amsat Indien

http://amsatindia.org/Newsletter/AMSATINDIA-News-April2011.pdf

*STS-134

http://www.nasa.gov/mission_pages/shuttle/main/rss_feed_above_snip_collection_archive_1.html

Vi hoppas på bättre conds nästa vecka.

73 Håkan SM7WSJ

Categories
Ham Satellite news

AMSAT India April 2011 Newsletter

Nu finns ett nytt nyhetsblad från AMSAT-India:

http://amsatindia.org/Newsletter/AMSATINDIA-News-April2011.pdf
Categories
Changes on amsat.se

Facebook, annonser, sociala medier

Under påskhelgen har det blivit några förändringar runt AMSAT-SM på webben:

– Vi är nu aktiva på Facebook med följande andress:
http://www.facebook.com/pages/AMSAT-SM/196154360421894

Jag har inga planer på att vara speciellt aktiv där men det ger ytterligare en reklamkanal till föreningen.

– Det finns nu möjlighet att länka en artikel på hemsidan till ett valfritt socialt medium, tex. Facebook eller Twitter. Dessa “sociala knappar” finns högst upp på varje artikel.

– Vi har under en månad gjort ett försök med att annonsera på Google till hemsidan, tex. vid sökning på “amatörradio” har en reklambanner till AMSAT-SM visats. Det har genom mätningar av besökstrafiken inte gått att se någon ökning till vår hemsida. Annonseringen är nu därför avbruten.

73
Lars SM0TGU    Webmaster

Categories
Ham Satellite news

Nyheter om ARISSat-1

Här följer några samlade notiser angående ARISSat-1:

 
AMSAT NEWS SERVICE
ANS-104 ANS Special Bulletin - ARISSat-1 Not Heard During Gagarin
Commemoration

SB SAT @ AMSAT $ANS-104.01
ARISSat-1 Not Heard During Gagarin Commemoration

AMSAT News Service Bulletin 104.01
>From AMSAT HQ SILVER SPRING, MD.
April 14, 2011
To All RADIO AMATEURS
BID: $ANS-104.01

The planned operation of ARISSat-1/RadioSkaf-V/KEDR on April
11 and April 12 from inside the International Space Station as part of the
commemoration of the 50th anniversary of Yuri Gagarin's flight was not
successful. No earth stations on the ground reported hearing transmissions
on the ARISSat-1 downlink(145.950 MHz for FM analog/145.920 MHz for
digital).
The planned retransmission of the satellite's FM downlink via the Kenwood
TM-D700 transceiver --currently used for ARISS contacts--was also not
successful as no reports were
received of signals heard on 437.550 MHz.   However, a 
similar ARISSat-1 transmission test conducted in February was successful,
with 145.950 MHz signals being successfully received by several ground
stations. 

At this point it isn't clear to the ARISSat-1 team what went wrong with the
most recent test.  Unfortunately, little information has been shared by
RSC-Energia concerning plans made to configure the satellite and the
interface used to connect the satellite to one of the external ARISS
antennas. 
The status of the satellite's Russian-provided silver zinc battery is also
unknown.

ARISSat-1 is a cooperative effort of AMSAT, RSC-Energia and NASA.  AMSAT
designed and built the spacecraft as a prototype of a proposed series of
educational satellites which can carry student-built experiments.  The
ARISSat-1 prototype features a student experiment designed and built by
Kursk State Technical University in Russia.  A backup was also provided
(without solar panels). AMSAT delivered the two units to NASA's Johnson
Space Center in Houston, TX in early October.  NASA has led the integration
of ARISSat-1 into the ISS flight program.  NASA coordinated the logistics of
transporting the satellite and a backup unit, including export licensing,
from Houston to Moscow.  The shipment occurred in early December immediately
following RSC-Energia confirmation that the appropriate import documentation
had been approved.  NASA also conducted the three-phase Payload Safety
Review that ARISSat-1 had to pass in order to be permitted to be shipped to
the ISS and deployed from the Space Station.  Per protocol agreements signed
by AMSAT, NASA and RSC-Energia, RSC-Energia assumed full responsibility for
ARISSat-1 after NASA shipped the prime and backup units.  RSC-Energia's
stipulated responsibilities included integration of the Kursk experiment,
providing a silver zinc battery for the spacecraft, shipment of the primary
flight unit to the ISS via a Progress Cargo vehicle (which took place in
January 2011) and subsequent deployment during a planned Russian EVA in
February 2011.  

Once AMSAT shipped ARISSat-1 and the backup unit in early October, AMSAT was
no longer directly involved with management and operation of the satellite.
AMSAT agreed to send a representative to Moscow (Lou McFadin, W5DID) in
order to assist with testing and final checkout of the satellite once it
arrived from the US.  Lou was accompanied by NASA's Mark Steiner, K3MS and
the requests for visas and access the RSC-Energia facilities was coordinated
by NASA.  Due to visa limitations (Russia does not allow changes to visas
once individuals are in Russia), the window for Lou's and Mark's  time in
Moscow could not be changed once it became apparent that the shipment was
being held by Russian customs and wouldn't be released until after the
expiration of visas.
During the time that Lou and Mark were in Moscow, testing procedures were
drafted and agreed to by RSC-Energia's principal investigator for ARISSat-1
(Sergey Samburov, RV3DR) as a signed protocol to assist the Russian
engineers with testing and checkout without the presence of AMSAT.  Lou and
Mark departed Moscow on 22 DEC 10 for the US and the satellite with the
backup unit were subsequently released from Russian customs and delivered to
RSC-Energia on
28 DEC 10 following submission of appropriate documentation by RSC-Energia. 

In addition to the missed opportunity for AMSAT and NASA to participate in
the checkout in Moscow, the delayed release from Russian Customs also meant
that the satellite arrived in RSC-Energia just as they were commencing a
10-day total holiday shutdown from 1-10 JAN 11.  In order to make launch of
the Progress 41P cargo vehicle to the ISS in January, the satellite had to
be flown to the Baikonour Cosmodrome on
11 JAN 11, the day after RSC-Energia personnel returned from their holiday.
Sergey Samburov, RV3DR spent a period of time during the holiday period
conducting a checkout of the satellite, but it is still unclear whether the
documentation provided by Lou McFadin and Mark Steiner and agreed to as a
protocol was followed.  For example, AMSAT and NASA have yet to receive any
of the full set of closeout photographs of the satellite's exterior
stipulated in the protocol.  

The satellite did make the flight to Baikonour and was subsequently flown to
the ISS on 28 JAN 11 on Progress cargo vehicle 41P.  Once the satellite
arrived at the Space Station, there was another unexpected alteration to the
original plan which has been previously agreed to by AMSAT, NASA, and
RSC-Energia.  Russian officials now wanted confirmation that the satellite
was in working order prior to EVA deployment.
Why this decision was made was never fully explained to AMSAT or NASA. Even
though the satellite was never intended to be operated from inside the ISS,
the RSC-Energia team made plans to operate ARISSat-1 from inside the ISS
during the period
10-13 FEB 11, connecting the two-meter transmitter to one of the external
antenna used for ARISS contacts with the intent of getting confirmation from
ground stations that the satellite's transmissions could be received by
amateur radio stations on the ground.  This unexpected development raised
AMSAT and NASA concerns given the potential for damage to the spacecraft
inside the ISS and the possibility of misinterpretation of results.  Despite
these concerns, the test was successfully conducted on 10 FEB 11 for 20
hours with the Kenwood TM-D700 on the ISS used to verify normal transmission
from the satellite. Ground stations, including Tony Monteiro AA2TX, did
provide reception reports confirming successful operation of the satellite.

ARISSat-1 was scheduled to be deployed during Russian EVA-28, scheduled for
16 FEB 11, as one of the planned tasks on that EVA.  However, AMSAT and NASA
were informed on 11 FEB that RSC-Energia officials decided to remove the
satellite deployment from the Russian EVA-28 schedule of activities due to
complications with another task scheduled for that EVA.  AMSAT and NASA were
informed that the
ARISSat-1 deployment would be rescheduled and included as a task in the next
Russian EVA, currently scheduled for July 2011. Around the same time, the
RSC-Energia Principle Investigator mentioned the possibility of a "special
event involving ARISSat-1" around the date of the 50th anniversary of the
Gagarin flight commemoration on 12 APR 11.  AMSAT and NASA inferred that, by
retaining the satellite onboard the ISS until the next Russian EVA in July,
RSC-Energia could ensure that the satellite could be activated within the
ISS specifically for the Gagarin Commemoration.  

During the period from the testing on 10 FEB 11 to the planned time of
activation on 11 APR 11, the satellite was placed in storage on the ISS.
AMSAT and NASA  were not informed of the configuration the satellite was in
when it was stored, though it appears that the Lexan covers over the solar
panels had been removed and replaced by 'soft covers' 
that were meant to be used only in preparation for deployment.
We were not informed if the satellite was deactivated following the test, or
if the battery was disconnected to prevent drainage, or if the satellite may
have been inadvertently left on. Given that operation of the satellite from
within the ISS was never part of the original plan and these activities took
place without AMSAT and NASA involvement, the ARISSat-1 engineering team is
in the dark concerning the impact of storage on the satellite. As the
originally agreed-to plan was to deploy the satellite within only a few
weeks of arrival on the ISS, there were no provisions made in the satellite
design to prepare the satellite for long-term storage on the ISS.

Adding to the lack of information was that the primary RSC-Energia Principle
Investigator for ARISSat-1 went on vacation for the entire month of March
and there wasn't a designated backup to coordinate with AMSAT and NASA.  
Sergey, RV3DR returned from vacation on 1 APR 11, but was unavailable for
the regularly scheduled weekly conference call that was scheduled to take
place on 5 APR 11. This meant that AMSAT and NASA were not apprised of the
details for planned operation of ARISSat-1 for the Gagarin Commemoration
until late in the first week in April.  AMSAT sent out a press release to
the media on Friday, 8 APR 11, as well as a special ANS Bulletin containing
the information that had been provided to AMSAT through information gathered
by our counterparts at NASA who have access to a schedule of the planned
daily activities of the ISS crew.

The documentation for the configuration and operation on 11-12 APR was
developed by RSC-Energia without AMSAT or NASA input.
AMSAT and NASA were provided a draft plan only a couple of days prior to
operation; that document was in Russian and we could not comment on it prior
to planned activation.  One new development was the last-minute decision by
RSC-Energia to retransmit the ARISSat-1 two-meter FM downlink on 70 CM by
configuring the Kenwood TM-700 that is currently used for ARISS contacts in
cross-band repeat mode.  The ARISS team was asked for a recommendation on
which frequency would be appropriate to use, and the suggestion was made to
use 437.550 MHz.  However, procedures for configuration of the TM-D700 were
not shared with AMSAT or NASA.  There remains the distinct possibility that
the unsuccessful result of this test was due to a misconfiguration of
ARISSat-1, its interface to the ARISS external antenna, or the TM-D700.  

An additional consideration is that the Cosmonauts who were available for
the Gagarin Commemoration were not necessarily the same individuals involved
with the 'test' in early February due to a planned crew rotation that took
place in early April, where three individuals (two Russian, one American)
were flown to the ISS to supplement three individuals who were still
onboard. 

Neither AMSAT nor NASA received any status reports directly from RSC-Energia
during the timeframe of the planned operation. We also don't know what the
Cosmonauts found when they operated the three activation switches on the
control panel, such as whether the LEDS were lit or not.  The status of the
flight battery is currently unknown to AMSAT and NASA.
Hopefully, RSC-Energia will provide an update on the status of the satellite
to AMSAT and NASA and a determination can be made of the health of the
satellite.

As noted above, ARISSat-1 is made possible through the cooperation of
RSC-Energia, NASA and AMSAT.  However, the degree of information received
from RSC-Energia has been very sporadic, given that ARISSat-1 is technically
a Russian satellite (callsign RS01S), and, per the signed protocol
agreements, RSC-Energia has assumed full responsibility for all activities
associated with ARISSat -1 from pre-launch preparation in Moscow through EVA
deployment from ISS.  Indeed, RSC-Energia has never publicly acknowledged
that AMSAT was the organization that built the satellite nor the significant
NASA involvement in the project. Clearly, what our expectations are
concerning 'transparency' of information does not coincide to what
RSC-Energia has been willing to share to date.

We will continue our efforts to gain insight from RSC-Energia concerning
what transpired regarding their planned Gagarin Commemoration event.  We're
anxious to know the status of the satellite as well as prospects for
deployment in July.  We are dependent upon the willingness of RSC-Energia to
keep AMSAT and NASA informed.  As we are apprised of developments, we will
share that information.  

 

Äldre nyheter nedan:

Categories
Ham Satellite news

AMSAT-SM-nätet 17/4 2011

Hej!

Dagens nät på 3740 kHz klockan 10.00.

Deltagare
SM4JLX
SM5HL
SM6NZV
SM7WSJ

*Lite allmänt runt satelliter

*ARISSat-1 (som inte hördes under veckan)

http://www.southgatearc.org/news/april2011/arissat1_not_heard.htm

En god påskhelg tillönskas! 73 de Håkan SM7WSJ

Categories
SDR and software

GPredict


GPedict är en fri programvara (Linux) för att spåra satelliter (tracking) och finns att ladda ner från:

http://gpredict.oz9aec.net/

Några äldre kommentarer runt programmet finns att läsa nedan.


2011-05-26

Hej alla satellitvänner

Upptäckte igår att man släppt en ny version av Hamlib där man löst de tidigare windowsproblemen (se nedan). Laddade hem det och har nu fått igång det hela så att gpredict mha hamlib styr min az/el-rotor i windows xp, men har inte hunnit prova rig-styrningen ännu. Den som väntar på nåt’ gott…   🙂
Tyvärr är det inte speciellt användarvänligt, man måste bl.a öppna dos-fönster där man startar upp hamlib’s rotordemon (rotctld) med en massa parametrar som man måste luska fram. Och med lite tur kommer man ihåg att det heter t.ex “COM1” i windows och inte “/dev/ttyS1” som det står i manualen som refererar till linux…  Inte direkt svårt om man har lite datorvana, men långt ifrån den användarvänlighet man är van vid.
Gpredict är det enda program jag hittat som kan styra både rotor och radio (med eller utan transverter) för satellitbruk som är helt gratis. (Berätta gärna om du känner till något annat!)Resultatet verkar bli mycket bra, så det kanske kan vara värt lite besvär att få igång det hela. Prova gärna själv och berätta om dina erfarenheter!
73 de Mats sm0rjv

Jag har använt mig av gpredict i Windows en tid (ett par
månader?) och det har en del egenskaper som jag gillar och inte har hittat i
något av de andra programmen jag kört. Senaste versionen är 1.3 från 8 Mars 2011
och kan hämtas på http://sourceforge.net/projects/gpredict/files/Gpredict/1.3/gpredict-win32-1.3-2.zip/download
Det stora problemet är att gpredict i nuläget inte KAN styra
rotor och radio under windows;
Gpredict använder sig av “hamlib”, som är linux motsvarighet
till t.ex windows”Omni-rig”, dvs ett fint försök att skapa ETT programpaket som
klarar att styra “alla” riggar (och rotorer) med ett standardiserat
interface för andra mjukvaror som t.ex gpredict, HRD, HDSDR osv kan använd sig
av för rig- och rotorstyrning.
När hamlib kompileras för windows uppstår tyvärr någon form av
problem med demonerna rigctld och rotctld, varför dessa inte finns med i
windows-distributionen.
Läs mer om hamlib på http://sourceforge.net/apps/mediawiki/hamlib/index.php?title=Main_Page
Detta är vad jag läst mig till på diverse forum mm så det är
möjligt att jag missat/missuppfattat något, jag kan inget om
programmeringsmiljöer i linux eller windows.
Det man kan hoppas på är alltså att någon som är en fena på
det lyckas kompilera hamlib för windows, eller kanske att gpredict-gänget kan
förmås att inkludera anrop till omni-rig också…
73 de Mats sm0rjv
—– Original Message —–
Nu var det visserligen evigheter sedan jag provade Gpredict och det var
på Linux.
rigctrld låter lite bekant och namnet antyder att det är en “deamon”.
Deamon betyder här att det är ett litet program som jobbar osynligt i
bakgrunden. Tanken är att Gpredict (och andra program som stöder rigctld)
skickar ett allmänt kommando, typ “sätt radions frekvens till 144.900 MHz”
till en nätverksadress och nätverksport och sedan är det upp till rigctld att
omtolka detta och skicka det på serie-/usbporten till radion.
Fördelen blir ju då att man i princip kan sitta var som helst i världen
och styra radion och Gpredict behöver dessutom inte veta hur man styr just din
radiomodell – det tar rigctld hand om (efter att du konfigurerat rigctld
korrekt). Typiskt så har du kanske en gammal linuxdator kopplad till radion,
men kan sitta och styra allt från Gpredict på din windows-laptop.
Samma gäller för rotctld.
Hoppas det klargjorde något…
73 de SM6YVS
14 mar 2011 kl. 18.03 skrev Inge:

Hej på er.

Kul med lite nya förslag. Kör bara Windows här för
närvarande (nästan).

Fick lov att testa Gpredict 1.3 så det laddade jag
hem, snabbt gick det.

Enkelt att köra igång, ingen installation, starta
direkt med gpredict.exe filen.

Men, inställning av radio hänvisar man till port,
minsta är 1024, kan inte vara com-porten.

Vid host så kan man skriva ”localhost” om man kör
”rigctld” på samma dator.

Vad jag fått fram så är det ett Linux program, någon
som vet mera?

Rotorn likaså, fast där hänvisar man till
”rotctld”.

Har jag missat något?

73 de Inge /
SM4JLX


Hej
agn!

Wl, här är hemsidan:
http://groundstation.sourceforge.net/gpredict/documents.php
“screenshots”
finns att hämta där.

en WIKI-sida:
http://sourceforge.net/apps/mediawiki/gpredict/index.php?title=Main_Page
men
där finns inget att hämta trots att det kollats 1018 gånger
(nyss).

Senaste version är 1,2 från oktober 2010.

73 de
Stig